| questão | resposta | |||
|---|---|---|---|---|
|
you will fond a ahort description in tue design brief
|
||||
|
is the design still in the concept phase?
|
||||
|
it's first draft of the preliminary drawings
|
||||
|
he approved the working drawings od Friday
|
||||
|
the contractor can make the shop drawings
|
||||
|
you will get the as-built drawings on tuesday
|
||||
|
the materials are described in the specyfications
|
||||
|
after revision F, it is now drawing number 35f
|
||||
|
the designer hasn't issued revision C yet
|
||||
|
they've approved all the amendments
|
||||
|
can you sent me the drawing in dwg format?
|
||||
|
maps are usually drawn in a small scale
|
||||
|
have you got this drawing in a larger scale?
|
||||
|
you will see the whole roof in the general arrangement drawing
|
||||
|
a single part drawing shows it in detail
|
||||
|
i checked thejoins in the assembly drawing
|
||||
|
that detail drawing is a section of the eaves
|
||||
|
is this a schematic drawing of the sewer
|
||||
|
there are five different views of the building
|
||||
|
he showed me a sketch of the front elevation
|
||||
|
i can't find the plan of the upper floor
|
||||
|
section C shows all the floor layers
|
||||